SUSHIL KUMAR AGARWAL Vs MEENAKSHI SADHU .

Bench: HON'BLE MR. JUSTICE UDAY UMESH LALIT, HON'BLE DR. JUSTICE D.Y. CHANDRACHUD
Judgment by: HON'BLE DR. JUSTICE D.Y. CHANDRACHUD
Case number: C.A. No.-001129-001129 / 2012
Diary number: 16566 / 2009
Advocates: SHEKHAR KUMAR Vs


1

1  

 

REPORTABLE  

    

IN THE SUPREME COURT OF INDIA  CIVIL APPELLATE JURISDICTION  

 CIVIL APPEAL NO. 1129 OF 2012  

 

   

SUSHIL KUMAR AGARWAL                                       .....Appellant      

 Versus   

 MEENAKSHI SADHU & ORS.              .....Respondents                          

     

J U D G M E N T        

Dr Dhananjaya Y Chandrachud, J  

 

 1. The present appeal1 is from the judgment of a Division Bench of the High  

Court of Calcutta2. The appellant, who is a builder, instituted a suit for specific  

performance of a development agreement, against the respondents, who are  

owners of the premises. The suit was dismissed by the City Civil Court. The  

High Court dismissed the first appeal.    

 

                                                 1 Leave was granted on 12 January 2012.  2 The High Court delivered judgment on 18 February 2009.

2

2  

 

2.  The subject matter of the suit for specific performance is a development  

agreement dated 14 April 1992, entered into by the appellant with the  

predecessor-in-interest of the respondents (Late Kalidas Sadhu)3 in respect of  

premises situated at 243N, Acharya Prafulla Chandra Road, P.S. Burtolla,  

Kolkata – 700 006. The agreement recites that the owners had approached the  

appellant for construction of a building on the land and that the following terms,  

inter alia, were agreed upon by and between the parties:  

 

a) The appellant agreed to apply at his own costs and expenses for sanction  

of the plan of a proposed building complex on 14 cottahs 5 chittacks and  

40 square feet, to the Calcutta Municipal Corporation (Clause-1 of the  

agreement);  

b) The plan of the building complex would be prepared and submitted by the  

appellant to the Calcutta Municipal Corporation, after the approval of the  

respondent (Clause -2 of the agreement);  

c) The appellant shall deposit with the respondent an amount of ₹ 4,00,000/-  

without interest which shall be refundable upon the completion of the  

building (Clause-3 of the agreement);   

d) If for any reason after the plan is sanctioned or for any act or omission on  

the part of the appellant, the construction cannot take place, the appellant  

shall refund the deposit in addition to all costs, charges and expenses  

incurred by the respondent (Clause-22 of the agreement);  

                                                 3 Late Kalidas Sadhu was the original respondent. Upon his death, by an order dated 12 May 2018, the legal  heirs of the original respondent were substituted as existing respondents.  

3

3  

 

e) The respondent shall retain 42% of the total constructed area as ‘sole  

owned’ and the balance 58% of the total constructed area shall remain  

secured for due payment of the construction costs. The total construction  

cost shall not exceed the value of 58% of the constructed area. The  

respondent agreed to pay the appellant the costs and expenses along with  

agreed remuneration upon completion of the construction and if the  

respondent failed to pay, the appellant was entitled to realise its money by  

selling 58% of the total constructed area (Clauses – 6, 10 and 11 of the  

agreement); and  

f) The respondent was entitled to demand any loss and/or damage suffered  

by him for any illegal activities of the appellant and the appellant was also  

entitled to recover damages from the respondent for lapse and negligence,  

in addition to the right of the parties to claim specific performance (Clause  

-24 of the agreement).  

 

3. The appellant alleged that upon the execution of the agreement, he found  

that the premises were encumbered and that there were arrears of municipal  

tax and electricity dues, besides which there were labour and industrial disputes  

and ‘factory closure problems’. The respondent is alleged to have requested  

the appellant to make payments and assured that he will reimburse him before  

the sanction of the building plan was obtained. Accordingly, the appellant claims  

to have made a payment of ₹ 7,03,000/-.   

4

4  

 

4.  On 18 March 2002, the respondent addressed a letter to the appellant  

and denied the execution of the agreement. The appellant, by a letter dated 4  

April 2002 protested the denial and requested the respondent to give him the  

authority to obtain sanction of the building plans. Parties thereafter met and  

agreed to modify the terms of the agreement with revised terms under which (i)  

allocation of the owner would be 47% instead of 42%; and (ii) allocation of the  

developer would be 53% instead of 58%.   

 

5.  On 26 May 2003, the appellant issued to the respondent a notice for  

payment of his share of the sanctioned fees. On 3 June 2003 the owner wrote  

a letter to the appellant through his advocate, denying the contents of the notice  

on the ground that he had by a notice dated 19 May 2003 cancelled the  

agreement and requested the appellant to return all documents and collect the  

deposit.   

 

6. On 6 August 2003, the appellant instituted a suit4 in the City Civil Court  

seeking a declaration that the cancellation of the agreement by the respondent  

was invalid and a permanent injunction restraining the respondent from entering  

into any agreement with a third party for sale of the premises. On 28 September  

2005 the City Civil Court allowed an amendment of the plaint, by which a prayer  

for specific performance was included.   

 

                                                 4 TS No.1150/03

5

5  

 

7. On 28 February 2007, the City Civil Court dismissed the Suit with the  

following observation:  

“No tangible evidence is forthcoming in the instant suit by  

which it can be said that the plaintiff (developer) obtained  

possession of the suit property i.e. the possession of the suit  

property is/has handed over to him after the execution of the  

agreement in question.”   

 

The City Civil Court relied on a judgment of a Division Bench of the High Court  

of Calcutta in Vipin Bhimani v Smt Sunanda Das5, that a suit for specific  

performance of a development agreement at the instance of a developer is  

barred by the provisions of Section 14(3)(c) of the Specific Relief Act 1963 (“the  

Act”). Upon examining various clauses of the agreement, the City Civil Court  

concluded that the appellant had agreed to apply at his own cost and expense  

to the Calcutta Municipal Corporation for getting the plans of the proposed  

building approved. The City Civil Court noted that it was an admitted fact that  

sanction was not obtained by the appellant and therefore, it could not be said  

that he had obtained possession. As a result, the suit at the instance of the  

appellant was held to be barred by Section14(3)(c).  

 

8. Aggrieved by the judgment and order of the City Civil Court, the appellant  

preferred an appeal6 before the High Court of Calcutta. On 18 February 2009  

the Division Bench of the High Court dismissed the appeal, on the ground that  

the suit was not maintainable under Section 14(3)(c) of the Act.   

 

                                                 5 (2006) 2 CHN 396  6 F.A. No. 175 of 2007

6

6  

 

The High Court rejected the appellant’s argument that even if Section 14(3)(c)  

stood in the way of getting a decree for specific performance, the Specific Relief  

Act not being exhaustive, there was no bar in granting a decree. The High Court  

held:  

 “….if in the Act there is a clear prohibition in granting a decree  

for specific performance in a given situation, such provision is  

exhaustive and cannot be made nugatory by contending that  

the Act is not exhaustive and thus, the Court can ignore such  

provision.”  

 

9. The High Court also rejected the argument of the appellant that the  

agreement in question was not a contract for construction of building on the  

land in a real sense, as the respondent was not getting any consideration for  

building. The High Court held that the agreement was in substance a contract  

of construction within the meaning of sub-section (3)(c) of Section 14 and the  

consideration was payable only upon the completion of the work.    

 

10. The issue which has been raised before this Court is whether Section  

14(3)(c) of the Act is a bar to a suit by a developer for specific performance of  

a development agreement between himself and the owner of the property. In  

dealing with this issue, the court needs to assess whether the word “defendant”  

in Section 14(3)(c)(iii) has the effect of confining the scope of the suit for specific  

performance only to a particular class (consisting of owners) or whether a  

purposive interpretation to the legislation would be required, so as to provide a  

broader set of remedies to both owners and developers. In deciding this issue  

the court will need to scrutinise the nature of a development agreement.     

7

7  

 

11. Section 14 provides thus:   

“14. Contracts not specifically enforceable-  

(1) The following contracts cannot be specifically enforced,  

namely -  

(a) a contract for the non-performance of which compensation  

in money is an adequate relief;  

(b) a contract which runs into such minute or numerous details  

or which is so dependent on the personal qualifications or  

volition of the parties, or otherwise from its nature is such, that  

the court cannot enforce specific performance of its material  

terms;  

(c) a contract which is in its nature determinable;  

(d) a contract the performance of which involves the  

performance of a continuous duty which the court cannot  

supervise.  

 

(2) Save as provided by the Arbitration Act, 1940 (10 of 1940),  

no contract to refer present or future differences to arbitration  

shall be specifically enforced; but if any person who has made  

such a contract (other than an arbitration agreement to which  

the provisions of the said Act apply) and has refused to perform  

it, sues in respect of any subject which he has contracted to  

refer, the existence of such contract shall bar the suit.  

 

(3) Notwithstanding anything contained in clause (a) or clause  

(c) or clause (d) of sub-section (1), the court may enforce  

specific performance in the following cases--  

(a) where the suit is for the enforcement of a contract,-  

 

(i) to execute a mortgage or furnish any other security for  

securing the repayment of any loan which the borrower is not  

willing to repay at once:  

 

Provided that where only a part of the loan has been advanced  

the lender is willing to advance the remaining part of the loan  

in terms of the contract; or  

 

(ii) to take up and pay for any debentures of a company;  

 

(b) where the suit is for-  

 

(i) the execution of a formal deed of partnership, the parties  

having commenced to carry on the business of the partnership;  

or  

 

(ii) the purchase of a share of a partner in a firm;  

8

8  

 

(c) where the suit is for the enforcement of contract for the  

construction of any building or the execution of any other work  

on land:  

 

Provided that the following conditions are fulfilled, namely: -  

(i) the building or other work is described in the contract in  

terms sufficiently precise to enable the court to determine the  

exact nature of the building or work;  

 

(ii) the plaintiff has a substantial interest in the performance of  

the contract and the interest is of such a nature that  

compensation in money for non-performance of the contract is  

not an adequate relief; and  

 

(iii) the defendant has, in pursuance of the contract, obtained  

possession of the whole or any part of the land on which the  

building is to be constructed or other work is to be executed.”  

 

 

Section 14(1) provides categories of contracts which are not specifically  

enforceable. Sub-section (3) of Section 14 is an exception to clauses (a), (c)  

and (d) of sub-section (1). Though the species of contract stipulated in clauses  

(a), (c) and (d) of sub-section (1) cannot be specifically enforced, a suit for  

specific performance of contracts of that description will be maintainable if the  

conditions set out in sub-clauses (i), (ii) and (iii) of clause (c) of Section 14(3)  

are satisfied.   

 

12. The consistent position of the common law is that courts do not normally  

order specific performance of a contract to build or repair. But this rule is subject  

to important exceptions, and a decree for specific performance of a contract to  

build will be made only upon meeting the requisite requirements under law.  

According to Halsbury’s Laws of England7, the discretion to grant specific  

                                                 7 Halsbury’s Laws of England, Fourth Edition, Volume 44(1), para 801

9

9  

 

performance is not arbitrary or capricious; it is governed by principles developed  

in precedents. The judge must exercise the discretion in a judicious manner.  

Circumstances bearing on the conduct of the plaintiff, such as delay,  

acquiescence and breach or some other circumstances outside the contract,  

may render it inequitable to enforce it. The position as elucidated in Halsbury’s  

Laws of England8 is thus:   

“… the court does not normally order specific performance of  

a contract to build or repair. However, this rule is subject to  

important exceptions, and a decree for specific performance of  

a contract to build will be made if the following conditions are  

fulfilled: (1) that the building work is defined by the contract  

between the parties; (2) that the plaintiff has a substantial  

interest in the performance of the contract of such a nature that  

he cannot be adequately be compensated in damages; (3) that  

the defendant is in possession of the land on which the work is  

contracted to be done.”  

 

13. This principle was followed by the Court of Appeal in Wolverhampton  

Corporation v Emmons9, where the plaintiff, the urban sanitary authority, in  

pursuance of a scheme of street improvement, sold and conveyed to the  

defendant a plot of land abutting a street, the defendant covenanting with them  

that he would erect buildings within a certain time. Upon the defendant failing  

to perform the agreement, the plaintiffs brought a suit against him claiming  

specific performance. Romer L.J, held that a plaintiff can bring himself within  

the exception, if three things are shown to exist: (i) the building work, the  

performance of which the plaintiff seeks to enforce, is defined by the contract  

allowing the court to know the exact nature and extent of work; (ii) the plaintiff  

                                                 8 Halsbury’s Laws of England, Fourth Edition, Volume 44(1), para 806  9 [1901] 1 K. B. 515

10

10  

 

must have a substantial interest in having the contract performed and the  

interest must be of such a nature that damages will not be an adequate  

compensation for the non-performance of the contract; and (iii) the defendant  

has obtained from the plaintiff by means of the contract the possession of the  

land on which the work is to be done. The case was held to come within the  

class of cases which had been recognised as forming an exception to the  

general rule that specific performance of a building contract will not be ordered.   

 

14. In a decision of the Chancery Division in Carpenters Estate v Davies10,  

an owner of land sold a certain portion of it to the purchaser for development,  

retaining land adjoining it, and agreed to lay roads and provide mains, sewers  

and drains on the land retained. The purchaser brought a suit for specific  

performance against the owner for not performing his obligations under the  

agreement. Farwell J., observed that the plaintiff is required to establish that the  

defendant is in possession of the land on which the work is contracted to be  

done. The facts of the case, indicated that the defendant was already in  

possession of the land, and there was no difficulty for her to carry out her  

obligations. Finding that the plaintiff proved all three conditions as laid out in  

Wolverhampton Corporation (supra), the court granted specific performance  

to the plaintiff.   

 

                                                 10 (1940) Ch. D 160

11

11  

 

15. The requirements to be satisfied by the plaintiff bringing forth a suit for  

specific performance have been analysed in Hudson’s Building and  

Engineering Contracts11 and in Price v Strange12, where the rule has been  

settled that the court will order specific performance of an agreement to build if:   

(i) the building work is sufficiently defined by the contract, for example by  

reference to detailed plans;  

(ii) the plaintiff has a substantial interest in the performance of the contract of  

such a nature that damages would not compensate him for the defendant’s  

failure to build; and   

(iii) the defendant is in possession of the land so that the plaintiff cannot  

employ another person to build without committing a trespass.   

 

16. The expression “development agreement” has not been defined  

statutorily.  In a sense, it is a catch-all nomenclature which is used to be  

describe a wide range of agreements which an owner of a property may enter  

into for development of immovable property.  As real estate transactions have  

grown in complexity, the nature of these agreements has become increasingly  

intricate.  Broadly speaking, (without intending to be exhaustive), development  

agreements may be of various kinds:  

(i) An agreement may envisage that the owner of the immovable property  

engages someone to carry out the work of construction on the  

                                                 11 Hudson’s Building and Engineering Contracts, Eleventh Edition, Volume 1, page 677  12  [1978] 1 Ch. 337 at page 359

12

12  

 

property for monetary consideration. This is a pure construction  

contract;  

(ii) An agreement by which the owner or a person holding other rights in  

an immovable property grants rights to a third party to carry on  

development for a monetary consideration payable by the developer  

to the other.  In such a situation, the owner or right holder may in effect  

create an interest in the property in favour of the developer for a  

monetary consideration;  

(iii) An agreement where the owner or a person holding any other rights  

in an immovable property grants rights to another person to carry out  

development.  In consideration, the developer has to hand over a part  

of the constructed area to the owner.  The developer is entitled to deal  

with the balance of the constructed area.  In some situations, a society  

or similar other association is formed and the land is conveyed or  

leased to the society or association;  

(iv) A development agreement may be entered into in a situation where  

the immovable property is occupied by tenants or other right holders.   

In some cases, the property may be encroached upon. The developer  

may take on the entire responsibility to settle with the occupants and  

to thereafter carry out construction; and  

(v) An owner may negotiate with a developer to develop a plot of land  

which is occupied by slum dwellers and which has been declared as  

a slum.  Alternately, there may be old and dilapidated buildings which

13

13  

 

are occupied by a number of occupants or tenants. The developer  

may undertake to rehabilitate the occupants or, as the case may be,  

the slum dwellers and thereafter share the saleable constructed area  

with the owner.    

 

When a pure construction contact is entered into, the contractor has no interest  

in either the land or the construction which is carried out.  But in various other  

categories of development agreements, the developer may have acquired a  

valuable right either in the property or in the constructed area. The terms of the  

agreement are crucial in determining whether any interest has been created in  

the land or in respect of rights in the land in favour of the developer and if so,  

the nature and extent of the rights.   

 17. In a construction contract, the contractor has no interest in either the land  

or the construction carried out on the land.  But, in other species of development  

agreements, the developer may have acquired a valuable right either in the  

property or the constructed area. There are various incidents of ownership of in  

respect of an immovable property.  Primarily, ownership imports the right of  

exclusive possession and the enjoyment of the thing owned. The owner in  

possession of the thing has the right to exclude all others from its possession  

and enjoyment.  The right to ownership of a property carries with it the right to  

its enjoyment, right to its access and to other beneficial enjoyments incidental  

to it. (B Gangadhar v BG Rajalingam13). Ownership denotes the relationship  

                                                 13 (1995) 5 SCC 239 at para 6

14

14  

 

between a person and an object forming the subject matter of the ownership. It  

consists of a complex of rights, all of which are rights in rem, being good against  

the world and not merely against specific persons. There are various rights or  

incidents of ownership all of which need not necessarily be present in every  

case. They may include a right to possess, use and enjoy the thing owned; and  

a right to consume, destroy or alienate it. (Swadesh Ranjan Sinha v Haradeb  

Banerjee14). An essential incident of ownership of land is the right to exploit the  

development, potential to construct and to deal with the constructed area. In  

some situations, under a development agreement, an owner may part with such  

rights to a developer. This in is essence is a parting of some of the incidents of  

ownership of the immovable property. There could be situations where pursuant  

to the grant of such rights, the developer has incurred a substantial investment,  

altered the state of the property and even created third party rights in the  

property or the construction carried out to be carried out. There could be  

situations where it is the developer who by his efforts has rendered a property  

developable by taking steps in law. In development agreements of this nature,  

where an interest is created in the land or in the development in favour of the  

developer, it may be difficult to hold that the agreement is not capable of being  

specifically performed. For example, the developer may have evicted or settled  

with occupants, got land which was agricultural converted into non-agricultural  

use, carried out a partial development of the property and pursuant to the rights  

conferred under the agreement, created third party rights in favour of flat  

                                                 14 (1991) 4 SCC 572

15

15  

 

purchasers in the proposed building. In such a situation, if for no fault of the  

developer, the owner seeks to resile from the agreement and terminates the  

development agreement, it may be difficult to hold that the developer is not  

entitled to enforce his rights. This of course is dependent on the terms of the  

agreement in each case. There cannot be a uniform formula for determining  

whether an agreement granting development rights can be specifically enforced  

and it would depend on the nature of the agreement in each case and the rights  

created under it.     

   18 In Chheda Housing Development Corporation v Bibijan Shaikh  

Farid15, a Division Bench of the Bombay High Court while dealing with the  

question of whether specific performance should be granted of a development  

agreement held as follows:  

“In our opinion from a conspectus of these judgments, what is  

relevant would be the facts of each case and the agreement  

under consideration. Agreements considering what is  

discussed, amongst others, could be:  

 

(a) An Agreement only entrusting construction work to a party  

for consideration.  

 

(b) An Agreement for entrusting the work of development to a  

party with added rights to sell the constructed portion to flat  

purchasers, who would be forming a Co-operative Housing  

Society to which society, the owner of the land, is obliged to  

convey the constructed portion as also the land beneath  

construction on account of statutory requirements.  

 

(c) A normal agreement for sale of an immovable property.   

 

An Agreement of the first type normally is not enforceable as  

compensation in money is an adequate remedy. An Agreement  

of the third type would normally be specifically enforceable  

                                                 15 (2007) 3 Mah LJ 402

16

16  

 

unless the contrary is proved. A mere agreement for  

development, which creates no interest in the land would not  

be specifically enforced.”  

 

19. The judgement of the Bombay High Court in Della Developers Private  

Limited v Noble Organics Private Limited16, deals with a case where a  

development agreement was executed between the petitioners and the  

respondents. A dispute arose between the parties and arbitration proceedings  

were initiated. An order was passed by the Arbitrator under Section 17 of the  

Arbitration and Conciliation Act 1996 against which an appeal was filed under  

Section 37. Before the High Court, the findings of the sole arbitrator under  

Section 17 were challenged. Upon examining the agreement, the High Court  

held that the agreement created a right or interest in immovable property. On  

the issue of the maintainability of a proceeding initiated by the developer against  

the owner under Section 14(3)(c), the court reiterated the requirement of  

fulfilling the three conditions under Section 14(3)(c). Hon’ble Mr. Justice A M  

Khanwilkar (as my learned Brother then was) held as follows:  

“Insofar as present case is concerned, out of the three  

conditions specified in Section 14(3)(c), prima facie, from the  

terms of the Agreement as executed between the parties, there  

is nothing to indicate that the Petitioner in pursuance of the  

contract, was put in possession of the whole or any part of the  

land on which the building is to be constructed or other work is  

to be executed.”  

 

20. In Ashok Kumar Jaiswal v Ashim Kumar Kar17, a Full Bench of the  

Calcutta High Court held that a development agreement with a clause for  

                                                 16 (2010) 2 Bom CR 13  17 AIR 2014 Cal 92

17

17  

 

conditional sale of the premises in question will also be an agreement for sale  

subject to certain conditions. While deciding whether a suit at the instance of a  

developer is maintainable in view of Section 14(3)(c), the Court, inter alia, held  

that in the absence of a definition of  "developer" or  "development agreement"  

the nature of the agreement which is the subject-matter of a suit must be  

considered in order to determine whether it is an agreement to merely provide  

construction of a building or whether the developer has obtained a share of, and  

interest in, the developed property which is the outcome of the agreement,  

creating a contract for transfer of immovable property. The Full Bench observed  

thus:  

“An owner without any funds or the independent resources to  

construct a new building on such owner’s land may engage for  

such purpose with the consideration for the construction being  

paid by allocation of a part of the constructed area. There could  

be several variants of the same basic structure of a  

development agreement…..Such agreements are not merely  

for the construction of any building or for the mere execution of  

any other work on the land. The developer is not merely a  

contractor engaged to undertake the construction; the  

developer is, under the agreement with the owner, promised a  

part of the constructed premises as owner thereof together with  

the proportionate area of the land.”  

 

 

The Full Bench held that a right to seek specific performance of a development  

agreement is not barred either expressly or by necessary implication by the  

1963 Act and a broad interpretation should be given to allow an adequate  

remedy:   

 

“….it would be preposterous to say that only the owner can  

maintain a suit against the developer for enforcing his rights  

and not vice-versa. If the developer has a right under the

18

18  

 

contract he must be having a remedy in the form of  

approaching a forum for appropriate redressal. A question of  

maintainability of a suit is completely different from the  

question of whether the suit will succeed or not on the facts of  

the case and in the light of the applicable law. Section 14 (3)(c)  

of the Act can in no manner be interpreted as debarring a  

developer from approaching the legal forum for redressal of his  

grievance.”  

 

 21. In the present case, the respondent agreed to pay the appellant the  

costs and expenses along with the agreed remuneration upon completion of  

the construction. If the respondent failed to pay, the appellant was entitled to  

realise its money by selling 58% of the total constructed area. Clauses 6, 10  

and 11 of the agreement indicate that the respondent would retain 42% of the  

total constructed area and the balance 58% would remain secured for due  

payment of the construction costs. It was further agreed, that the total  

construction costs shall not exceed 58% of the constructed area. The intention  

of the parties is clear from the agreement. This was an agreement to carry out  

the construction of the building for which payment of the construction costs and  

agreed remuneration had to be made. The agreement did not create an interest  

in the land for the developer. If the payment due to the developer was made,  

there would arise no security interest. Moreover, the security interest in respect  

of 42% of the constructed area would arise only if the construction came up and  

the payment due to the builder was not made. In present case, admittedly there  

is no construction at all.   

19

19  

 

22. Various High Courts have interpreted the requirements under Section  

14(3)(c) of the Act and opined on the maintainability of a suit by the developer  

for specific performance against the owner of the property for a breach in the  

conditions of the development agreement. A common thread that runs through  

the analysis in decided cases is the following:   

 

(i) The courts do not normally order specific performance of a contract to build  

or repair. But this rule is subject to important exceptions, and a decree for  

specific performance of a contract to build will be made only upon meeting  

the requirements under law;   

(ii) The discretion to grant specific performance is not arbitrary or capricious  

but judicious; it is to be exercised on settled principles; the conduct of the  

plaintiff, such as delay, acquiescence, breach or some other circumstances  

outside the contract, may render it inequitable to enforce it;   

(iii) In order to determine the exact nature of the agreement signed between  

the parties, the intent of the parties has to be construed by reading the  

agreement as a whole in order to determine whether it is an agreement  

simpliciter for construction or an agreement that also creates an interest  

for the builder in the property. Where under a development agreement, the  

developer has an interest in land, it would be difficult to hold that such an  

agreement is not capable of being specifically enforced; and   

(iv) A decree for specific performance of a contract to build will be made if the  

following conditions are fulfilled:   

20

20  

 

a) the work of construction should be described in the contract in a  

sufficiently precise manner in order for the court to determine the exact  

nature of the building or work;   

b) the plaintiff must have a substantial interest in the performance of the  

contract and the interest should be of such a nature that compensation  

in money for non-performance of the contract is not an adequate relief;  

and   

c) the defendant should have, by virtue of the agreement, obtained  

possession of the whole or any part of the land on which the building is  

to be constructed or other work is to be executed.   

 

23. The issue before this Court is whether Section 14(3)(c)(iii) is a bar to a  

suit by a developer for specific performance of a development agreement  

between himself and the owner of the property. The condition under Section  

14(3)(c)(iii) is that the defendant has, by virtue of the agreement, obtained  

possession of the whole or any part of the land on which the building is to be  

constructed or other work is to be executed. If the rule of literal interpretation is  

adopted to interpret Section 14(3)(c)(iii), it would lead to a situation where a suit  

for specific performance can only be instituted at the behest of the owner  

against a developer, denying the benefit of the provision to the developer   

despite an interest in the property having been created. This anomaly is created  

by the use of the words “the defendant has, by virtue of the agreement, obtained  

possession of the whole or any part of the land” in Section 14(3)(c)(iii). Under a

21

21  

 

development agreement, an interest in the property may have been created in  

favour of the developer. If the developer is the plaintiff and the suit is against  

the owner, strictly applied, clause (iii) would require that the defendant should  

have obtained possession under the agreement. In such a case if the developer  

files a suit for specific performance against the owner, and the owner is in  

possession of the land by virtue of a lawful title, the defendant (i.e. the owner)  

cannot be said to have obtained possession of the land by way of the  

agreement. This would lead to an anomalous situation where the condition in  

Section 14(3)(c)(iii) would not be fulfilled in the case of a suit by a developer.   

Application of the literal rule of interpretation to Section 14(3)(c)(iii), would lead  

to an absurdity and would be inconsistent with the intent of the Act.   

 

24. The conditions that should be present to justify a departure from the plain  

words of any statute, have been elucidated in Justice GP Singh’s treatise on  

Principles of Statutory Interpretation18 (while discussing the decision of the  

House of Lords in Stock v Frank Jones (Tipton) Ltd.19):   

“...a court would only be justified in departing from the plain  

words of the statute when it is satisfied that (1) there is clear  

and gross balance of anomaly; (2) Parliament, the legislative  

promoters and the draftsman could not have envisaged such  

anomaly and could not have been prepared to accept it in the  

interest of a supervening legislative objective; (3) the anomaly  

can be obviated without detriment to such a legislative  

objective; and (4) the language of the statute is susceptible of  

the modification required to obviate the anomaly.”  

 

                                                 18 Principles of Statutory Interpretation, 12th Edition - 2010, Lexis Nexis - page 144  19 (1978) 1 WLR 231

22

22  

 

The principle has been also adverted to in Maxwell on Interpretation of  

Statutes20 :  

“Where the language of a statute, in its ordinary meaning and  

grammatical construction, leads to a manifest contradiction of  

the apparent purpose of the enactment, or to some  

inconvenience or absurdity, hardship or injustice, presumably  

not intended, a construction may be put upon it which modifies  

the meaning of the words, and even the structure of the  

sentence.”  

 

 

By giving a purposive interpretation to Section 14(3)(c)(iii), the anomaly and  

absurdity created by the third condition will have no applicability in a situation  

where the developer who has an interest in the property, brings a suit for  

specific performance against the owner. The developer will have to satisfy the  

two conditions laid out in sub clause (i) and (ii) of Section 14(3)(c), for the suit  

for specific performance to be maintainable against the owner. This will ensure  

that both owners and developers can avail of the remedy of specific  

performance under the Act. A suit for specific performance filed by the  

developer would then be maintainable. Whether specific performance should in  

the facts of a case be granted is a separate matter, bearing on the discretion of  

the court.   

 

25. Having dealt with the first aspect of the matter, it is now necessary to  

determine whether, in the facts of the present case, the agreement between the  

appellant and the respondent is capable of specific performance. For this  

                                                 20 Maxwell, Interpretation of Statutes, 11th Edition, page 221

23

23  

 

purpose, it would be necessary to consider the terms and conditions of the  

agreement between the parties.  

 

26. The condition under Section 14(3)(c)(i) is that the building or other work  

described in the contract is sufficiently precise to enable the court to determine  

the exact nature of the building or work. To examine the question as to whether  

the scope of the building or work described in the agreement is sufficiently  

defined, the Court needs to determine the exact nature of the work by referring  

to the relevant clauses of the agreement. Clause 8 of the agreement provides  

that the building shall be constructed in accordance with approved plans and  

built with “first class materials” with wooden doors, mosaic floor, basin and  

lavatories, tap water arrangement, masonry work, electric points, finished  

distemper and bath room fittings of glazed tiles up to 6” height and lift, “etc.”  

Further, at clause 13 of the agreement, the parties have agreed that the  

contractor would construct a building at the premises consisting of “residential  

apartments of various sizes and denomination” in the said building complex in  

accordance with plans sanctioned by the Calcutta Municipal Corporation and  

the owner shall convey the proportionate share in the land to the respective  

buyers. Clause 22 of the agreement states that if for any reason after the plan  

is sanctioned or “for any act or omission on the part of the owner” the building  

cannot be constructed; the owner shall refund to the contractor ₹4,00,000/- in  

addition to all costs, charges and expenses incurred by the contractor. At clause  

20 of the agreement, the parties have agreed that the apartments of the owner

24

24  

 

shall be constructed and be made in “similar condition” as that of the contractor  

with water connection, sewerage, electric wiring except “special fittings”.  Use  

of such vague terms in the agreement such as “first class materials”, “residential  

apartment of various sizes and denomination”, “etc.”, “similar condition”, and  

“special fittings”, while discussing the scope of work clearly shows that the exact  

extent of work to be carried out by the developer and the obligations of the  

parties, have not been clearly brought out. Parties have not clearly defined, inter  

alia, the nature of material to be used, the requirements of quality, structure of  

the building, sizes of the flats and obligations of the owner after the plan is  

sanctioned. Further, clause 9 of the agreement states that the owner shall pay  

the contractor costs, expenses along with agreed remuneration only after  

completion of the building on receiving the possession. However, the exact  

amount of remuneration payable by the owner to the contractor is not to be  

found in the agreement. The agreement between the parties is vague. The court  

cannot determine the exact nature of the building or work. The first condition in  

Section 14(3)(c)(i) is not fulfilled.   

 

27. Another condition under Section 14(3)(c)(ii) is that the plaintiff has a  

substantial interest in the performance of the contract and the interest is of such  

a nature that compensation in money for non-performance of the contract is not  

an adequate relief. The intent of the section is to make a distinction between  

cases where a breach of an agreement can be remedied by means of  

compensation in terms of money and those cases where no other remedy other

25

25  

 

than specific performance will afford adequate relief. Therefore, before granting  

the remedy of specific performance, we need to analyse the extent of the  

alleged harm or injury suffered by the developer and whether compensation in  

money will suffice in order to make good the losses incurred due to the alleged  

breach of the agreement by the owner. From the facts of the case, it is clear  

that the case of the developer is that he incurred an expenditure of ₹ 18,41,000/-  

towards clearing outstanding dues, security deposit and development,  

incidental and miscellaneous expenses. The alleged losses/damages incurred  

by the Plaintiff can be quantified. The plaintiff can be provided recompense for  

the losses allegedly incurred by payment of adequate compensation in the form  

of money. The developer has failed to satisfy the conditions under sub-clause  

(i) and (ii) of Section 14(3)(c) of the Act. In such a case, specific performance  

cannot be granted.   

 

28. By the Specific Relief (Amendment) Act 201821, Section 14 has been  

amended to read as follows:  

“14. The following contracts cannot be specifically enforced,  

namely:—  

(a) where a party to the contract has obtained substituted  

performance of contract in accordance with the provisions of  

section 20;  

(b) a contract, the performance of which involves the  

performance of a continuous duty which the court cannot  

supervise;  

(c) a contract which is so dependent on the personal  

qualifications of the parties that the court cannot enforce  

specific performance of its material terms; and  

(d) a contract which is in its nature determinable.”  

 

 

                                                 21Act 18 of 2018

26

26  

 

However, the amended section has been notified on 19 September 2018 and  

the central government has appointed 1 October 2018 as the date on which the  

provision of Act 18 of 2018 will come into force22. However, in the present case,  

we are not called upon to examine the effect of this amended provision. In any  

case, we have indicated the reasons why Section 14(3)(c) was not attracted.   

 

29. The appellants have relied on the decision of this Court in Her Highness  

Maharani Shantidevi P Gaikwad v Savjibai Haribai Patel23,  where an  

agreement was entered into between the landowner and the developer for the  

purpose of construction of houses for the weaker sections on excess vacant  

land under a scheme sanctioned under Section 21 of the Urban Land (Ceiling  

and Regulation) Act 1976.  This Court reversed the decision of the High Court  

that granted the decree of specific performance to the developer on the grounds  

that it was inequitable to enforce specific performance in view of a change in  

the Master Plan. The court noted that a contract which involved continuous  

supervision of the court, was not specifically enforceable. Further, in the opinion  

of the court, at best the plaintiff - builder could claim damages and the  

expenditure incurred by him for the implementation of the terms of the  

agreement. The above case has no applicability to the facts of the present case  

and is of no relevance as the issue in relation to the maintainability of a suit for  

specific performance by the builder against the owner has not been discussed.  

                                                 22 S.O.4888(E) dated 19.09.2018  23 AIR 2001 SC 1462

27

27  

 

30. The appellant has also placed reliance on the decision in Faqir Chand  

Gulati v Uppal Agencies Private Limited24, where the issue before this Court  

was whether a landowner, who enters into an agreement with the builder, for  

construction of an apartment building is a “consumer” entitled to maintain a  

complaint against the builder as a service provider under the Consumer  

Protection Act, 1986.  The Court held:  

“We may notice here that if there is a breach by the landowner  

of his obligations, the builder will have to approach a civil court  

as the landowner is not providing any service to the builder but  

merely undertakes certain obligations towards the builder,  

breach of which would furnish a cause of action for specific  

performance and/or damages. On the other hand, where the  

builder commits breach of his obligations, the owner has two  

options. He has the right to enforce specific performance  

and/or claim damages by approaching the civil court. Or he can  

approach the Forum under Consumer Protection Act, 1986 for  

relief as consumer, against the builder as a service- provider.”  

 

The issue involved before this Court was in relation to the interpretation of the  

Consumer Protection Act, 1986 and not on the maintainability of a suit filed by  

the developer against the owner for specific performance in view of Section  

14(3)(c) of the Act. Therefore, the decision cannot be relied upon in relation to  

the issue before us.    

 

31. Ordinarily, if there was an alternative plea for damages or monetary relief,  

we would have remanded the case to the High Court for consideration of the  

prayer. However, in the impugned judgment, the Division Bench has observed  

thus:  

                                                 24 (2008) 10 SCC 345

28

28  

 

“Although we find no merit in this appeal, we wanted to give  

liberty to the plaintiff for amendment of the plaint for the  

purpose of getting alternative relief by way of return of security  

of money and damages, if at all suffered, in terms of Section  

22 of the Specific Relief Act; but Mr. Das, the learned Advocate  

appearing on behalf of the appellant after taking instruction  

from his client submitted before us that his client did not want  

to avail of such remedy and wanted to challenge our decision  

by preferring an appeal if we decided to refuse the prayer for  

specific performance of the contract. ”  

 

The same statement has been made before this Court, as was made before the  

High Court. In the absence of any plea for damages or monetary relief by the  

respondents, there is no reason to remit the appeal back to the High Court.  

 

32. For the above reasons we find no merit in this appeal. The appeal stands  

dismissed. There shall be no order as to costs.      

         